Sunday, August 24, 2014

Time to get ready..

So.. I've been out a bit.  We haven't had the camper on the road due to my job lately... but I've been plotting and planning for what the fall will hold.

1. On September 29th, we have an appointment to put Solar panels on the camper.  We are putting 3 x 135W panels on our camper.  AM Solar is going to do the work.  We went down there last fall and talked to them about building a system for our needs.  We would like to have enough power to run the refrigerator circuit board, water pump, water heater thermostat, and the furnace fan for 6 hours at night.  For these requirements, we will need 3 x 135w panels, the wiring, and the control module to run the system.  We are excited about this capability.

2. We are planning to take the camper down the coast.  I'm not sure where all we are going to head to, but we might check out Yosemite NP as well.

3. We also plan to stop in some of the state parks in Oregon- so who knows if we'll even make it to CA.  Oregon is really nice.  We are going to try to check out the the Benchmade factor and possibly the Leatherman factory as well.  We will see.

We are excited to get the camper out on the road.

Take care,
Steve

No comments:

Post a Comment